BidCraft Tile
BidCraftTile
Jump to…

Offering packages (Good, Better, Best)

Most homeowners want to see a choice: a solid job, a nicer one and the best you do. Packages put that choice on one job type. Only the lines that actually change between packages carry more than one price. Demo, plumbing and prep stay the same in every package and are never optional.

Packages are optional. A job type without them works exactly the way it always has. And a job type with packages doesn't put them on every bid: you choose, bid by bid, whether the homeowner gets the choice.

Add packages to a job type

Open a job type under Your templates in Settings → Bid settings. Under the lines you'll see Offer packages? Tap Add packages and go through three steps:

  1. Names. Your own names come first (Yours: …), then Good / Better / Best and Standard / Premium / Luxury, or type your own. You can have 2 to 4. Pick the one you recommend; it starts as the middle one. Here you also decide whether new bids start with packages on (Offer packages on every new bid). It's off unless you turn it on.
  2. Which lines change? Tile, the shower floor and glass are checked for you. Demo, plumbing, prep, fees and permits are left unchecked, because they're the same in every package.
  3. Fill in a price for each package. Open each line and type what you charge for each package. For a tile line, pick the tile size, material and pattern from the dropdowns. BidCraft writes what the homeowner reads and suggests a price from your difficulty multiplier. For other lines, pick a service from your catalog for each package and set the price. A line that still needs prices is marked Needs prices, and a package that has none says No price yet. A package left blank uses the line's usual price.

Tap Save.

Your own names, once

When you add packages to a job type and type names of your own, Use these names for new job types is ticked for you. Save, and every new job type you add packages to starts with those names, and they're listed first as Yours: …. Until you save names this way, Yours shows the tiers BidCraft learned from your past proposals, if it learned any. Job types you already set up keep their own names.

To rename the packages on a job type you already set up, tap Edit packages and change the names on step 1. Each package keeps its prices and tiles, and your homeowner's package cards use the new names. Renaming one job type doesn't change your names for new job types unless you tick Use these names for new job types.

Packages for a fixture, like a tub

A package doesn't have to be a tile. It can be a product at three levels, like a freestanding tub in acrylic, insulated acrylic or stone resin.

  1. On step 1, name the packages after the products: Acrylic, Insulated acrylic, Stone resin.
  2. On step 2, only the tub line is ticked, because your names are tubs. Every other line, tile included, starts unticked, since your packages are about the tub. A vanity, toilet, shower door, valve and trim, or faucet line is ticked the same way when your names are those products. With Good / Better / Best a tub line stays unticked, so tick it yourself if you want it to change.
  3. On step 3, each package asks for the Product, which is what the homeowner reads ("Stone resin freestanding tub"), and your Installed price. Picking a catalog service is optional. Materials work the way they do on any line.

On a job, your notes pick the tub: "stone resin tub" lands on Stone resin, and "insulated acrylic tub" on Insulated acrylic. Just "acrylic" picks plain Acrylic, not Insulated acrylic. "No tub" or "existing tub stays" picks nothing, so the line uses your recommended package.

Reading the grid with packages

A package control sits beside the size control. Under it, Offer packages on every new bid says whether a new bid starts with packages on. Turn it on if you want the homeowner to choose on almost every job; leave it off and turn packages on for the bids that need them.

Under each line that changes, one row per package shows:

  • the package name, what the homeowner reads, and a swatch of the tile;
  • its own price, cost and margin, and how many materials and tasks it has.

The line itself reads 3 packages in the price column. The rows are open when you arrive. Use Hide packages on the line to fold them away and Show packages to bring them back.

Under the lines, the totals show every size and package side by side, with the one you picked highlighted. Tap a total to switch to that size and package. Beside it is a preview of the package cards exactly as your homeowner will see them, with your recommended one marked.

Setting a line's packages

Open any line that changes. The Packages tab sits between Pricing and Materials, with one card per package. Fill in a price for each one; a card with no price says No price yet, and left blank it uses the line's usual price.

  • Tile lines: pick the tile size, material and pattern. What the homeowner reads fills in from your picks, and you can change the wording. The price shows Suggested $X from your difficulty multiplier, worked out from your difficulty multiplier settings for the tile you picked. Tap Use suggestion, or type your own price. A price you type always wins.
  • Other lines: pick a service from your catalog for each package, set the wording and the price.
  • Fixture lines (a tub, vanity, toilet, shower door, valve or faucet): name the Product for each package and type your Installed price. A catalog service is optional.
  • On a job type with sizes, a flat-priced line can take a price for each size in each package.
  • Doesn't change between packages turns the line back into a shared line, after you confirm.

Package prices belong to this job type only. They never change the price in your catalog.

Tasks: a package uses the line's tasks. If you pick a different service for a package, that service's tasks are used instead.

The difficulty multiplier is never charged twice

A package's price already covers the tile it names. So on a job, the difficulty multiplier only adds to a package line when the measured tile is harder than what the package names.

For example, your Best package names 24 × 48 porcelain. On a job measured at 24 × 48, nothing is added. On a job measured with a harder tile, only the difference between the two is added. A package that doesn't name a tile prices the way the line always has.

On a job

When you draft a scope for a job of this type, each line that changes comes in as one line, on the package that fits the job. Shared lines are ordinary lines. Prices follow the job's size when the job type has sizes. A price you type on a line still beats the package price.

Your notes pick the package

BidCraft picks each line's package from what you wrote and measured, line by line:

  • What you measured comes first. A wall measured as 24 × 48 or as mosaic lands on the package with that tile.
  • What your notes say comes next: words like large format, mosaic, herringbone, marble, porcelain, frameless, semi-frameless, linear drain or curbless, a tile size like 24x48, or what a fixture is made of, like stone resin, solid surface, cast iron, insulated, acrylic, enameled steel, copper, soaking or clawfoot.
  • Then words that only one package's description uses, like sliding.

So "large format tile, frameless glass" can put the tile on Best and the glass on Best while the shower floor stays on your recommended package. Everyday words like tile, shower or door never decide it. When two packages both fit, the plainer one wins: "acrylic" picks Acrylic over Insulated acrylic. If nothing points one way, or two packages really fit equally, the line uses your recommended package. Notes about the old tile ("tear out the existing mosaic") don't count.

When packages are on for the bid, each line says which package it's on and why, for example Best · from your notes: large format or Better · recommended. When they're off, the line reads like any other line.

Offer Good / Better / Best on this bid

If the job type doesn't offer packages on every new bid, the scope stays quiet: there's no packages switch, just Offer packages… in the Totals card. Tap it to turn packages on for this bid. From then on the switch shows at the top of this bid's scope, so you can turn them off again.

If the job type does offer packages on every new bid, the Offer Good / Better / Best switch (it uses your package names) sits at the top of the scope, beside the size, and decides whether this homeowner gets the choice:

  • Off: one line each, on the package that fits the job. The homeowner sees an ordinary proposal.
  • On: each line that changes becomes a choice between your packages, starting on the package your notes picked (or your recommended one). The homeowner sees the package cards.

Switching it doesn't use AI and doesn't lose your work. A price you typed, wording you changed or days you set stay on the line for the package you chose. Switching off keeps the package you have selected on each line. Switching back on brings the other packages back, with anything you'd changed on them. Anyone who can edit the scope can use the switch until the scope is locked. A re-draft keeps your choice for the bid.

Biddy remembers "no"

If a job type offers packages on every new bid and you turn them off on your last 3 bids of that job type, Biddy asks once, under the switch: Stop offering them by default?

  • Stop by default turns off Offer packages on every new bid for that job type. New bids start with one line each, and Offer packages… is there when you want them.
  • Keep offering leaves it on, and Biddy won't ask again for that job type.

Only owners and admins are asked, because the answer changes the job type. The bid you're on stays as it is.

If you make a variant of a job type, its packages and sizes come with it.

Jobs with more than one room

On a job with two or more rooms (a Master Bath and a Hall Bath, say), each room is built from your template on its own, so each room has its own copy of every line that changes, named for the room: "Master Bath — Floor tile" and "Hall Bath — Floor tile".

  • Each room's notes pick that room's package. Marble in the Master Bath's notes puts the Master Bath's tile on Best; the Hall Bath's tile stays on the package its own notes or measurements point to, or your recommended one.
  • Each room's prices follow that room's size. A Small hall bath's Better shower floor is your Small price, the Large master bath's is your Large price. Shared work for the whole job that changes between packages is priced at the biggest room's size.
  • One switch for the whole job. Offer Good / Better / Best turns packages on or off for every room at once.
  • One choice for your client. They pick a package once and every room follows. Customize lets them change a single room's line.
  • Changing a room's size keeps the packages together: a line the new size brings in joins the same choice, and a line it takes out leaves it.

If you price jobs By the day, the day total prices the bid, so packages change the tile and materials on the bid but every package shows the same total. The package prices are used on jobs you don't price by the day.

What your homeowner sees

When packages are on for the bid, the lines that change show as package cards: each card has the package name, the total for the whole job, and what's different in it. Your recommended package is marked Recommended. Each line starts on the package your notes picked, so the proposal can open on Your mix when your notes chose different packages for different lines. Picking a card switches every line that changes at once.

Customize lets them pick a different package for one line, like the Best tile with the Good glass. The cards then show Your mix with the total, and a way back to your recommended package. Shared work like demo is never on the list.

When they sign, you get exactly the lines they picked plus every shared line, and the total matches.

On a job with more than one room, the package cards come once, above the rooms, headed Choose one package for the whole job and naming the rooms it covers. Each room still lists its own lines, showing the package it's on. What's different and Customize list every room's line separately ("Hall Bath — Floor tile"), so your client can pick the Best tile for the Master Bath only. Your own copy of the proposal and the PDF show the same thing: the packages once at the top, and each room's choices in that room.

When packages are off for the bid, the homeowner sees an ordinary proposal: one line for each piece of work, on the packages you picked.

If you already made Standard / Premium / Luxury variants

If your job type has finish-level variants, the page offers to turn them into packages. It sets up the packages from your variants and copies over the lines that differ. You're asked before anything happens to the variants, and archiving them never deletes them.

Was this article helpful?
Still need help?

Email andy@businessupai.com and a real person on the BidCraft Tile team will get back to you. If you're signed in, you can also ask Biddy from any page in the app.