Jump to…
- You don't need photos to get here
- First, BidCraft confirms anything unclear
- Why scope comes first
- Jobs with more than one room
- How the work is grouped
- Fix the fixtures BidCraft found
- What you're looking at
- The line panel
- The crew days you see are the final days
- Shaping the list
- When the AI returns an empty scope
- Deciding what's your client's call
- The prices are already here
- Lock & build
- When a price is different from your scope
- Locked but no proposal? Unlock from the project page
- Next steps
Reviewing the scope of work
After Biddy analyzes your photos and notes — or after you type your measurements in by hand — the next stop is the scope. It's the first stage of Bid, and it already has real money on it: every line that matched a service in your catalog shows a price, sized to the measurements from your rooms, with your multipliers applied and the crew days beside it. No waiting, no AI guess. You shape the work list and the numbers here, and what you set is what gets built.
Once a proposal has been built, tapping Bid opens on the proposal instead, since that's usually what you're coming back for. The scope is still one tap away: Scope & pricing is the first of the three cards at the top of Bid — Scope & pricing, Proposal, Costs & materials, in order, with an arrow between each. Tap a card to switch; the one you're on is highlighted.
You don't need photos to get here
There are two ways to land a scope draft, and neither one requires a photo:
- Let the AI draft it. Once the required measurements for your project type are filled in — whether they came from photos, a voice note, or you typing them straight into the Measurements card — the Draft Scope of Work button unlocks and the AI writes the work list from your numbers.
- Build it manually. Prefer to skip the AI draft and lay out the lines yourself? Choose Build scope manually and you get two ways to start:
- Start from [project type] template — pre-fills the standard work lines for that type. A shower remodel drops in the demo (with haul-off), the tile work with its prep and waterproofing inside, and the fixtures, ready for you to tweak. If your proposals list every step on its own line, you get those steps as separate lines instead (see How the work is grouped).
- Start blank — an empty list. Add lines by hand, including pulling services straight from your catalog (see Adding a line from your services catalog).
Either way, once the lines are in front of you, you edit them and hit Lock & build proposal exactly like a draft the AI wrote. The manual path is handy when you've done this exact job a hundred times and already know every line — no need to wait on a draft you'd rewrite anyway.
First, BidCraft confirms anything unclear
Before there's a scope to draft, BidCraft checks whether anything important is still unclear — a measurement it's not confident about, or a scope-defining question that hasn't been answered (permits, glass enclosure, demo extent, that kind of thing). Those questions come up as soon as a room finishes analyzing, and they show on that room's card over in Capture, underneath the measurements they'd change. So you answer a question about the shower while you're looking at the shower's photos and numbers, not later on a different screen. A question about the whole job rather than one room gets its own slim strip above the rooms.
Open checks don't lock the Draft button. Press it (or Re-draft) while checks are still open and BidCraft asks which you'd rather do: Answer the checks first scrolls you straight to the first one, opening its room if it was collapsed; Draft anyway writes the scope now, and every line an open check would have changed says what it assumed right in its own description ("Assumes 8 ft ceilings — confirm before ordering"), so nothing is hidden and the checks stay open for whenever you get to them. Closing the dialog with Escape or a click outside counts as "answer first" — it never drafts on its own. Rooms that haven't been analyzed yet still block the button; that one you have to do.
Answering a check never drafts the scope, not even the last one. Tap an answer and the check turns green with Got it while it saves, then drops off the list, and a short Answer saved note confirms it. When the room reads right, press Draft yourself.
What you say in a note becomes data. If you state a dimension in a voice or text note ("shower is 3 by 5 by 8 tall," "ceiling is 8 feet"), BidCraft extracts those values and the confirm card stops asking about them. Mention niches ("there's a 12x14 niche," "two shower niches," "no niches needed") or inside/outside corner counts on jogged walls and those get pulled in too — including when you say you don't want something ("no niche," "skip the bench"), so BidCraft won't turn around and ask about it.
It won't re-ask for numbers you can already see. If a measurement is already showing on a surface tile — even a rough estimate — the confirm card leaves it alone instead of asking again. If BidCraft is unsure but has a best guess, you'll see that guess pre-filled with a quick ✓ Looks right to accept it as-is, or Edit to fix it.
Re-analyzed after you already drafted? The changes still surface. Even once a scope exists, running a fresh analysis can bring this card back with one-tap "what changed" chips at the top — "Shower walls: 96 → 104 sqft" — so a new reading never slips in behind your back. Tap ✓ to accept a change and lock it as yours, or leave it alone. Reviewing the AI findings covers those chips in full.
Each question sits in its own small frame with a one-line note on why BidCraft is asking. Three show at a time; tap "{n} more…" to reveal three more rather than dumping the whole list on you at once.
[!steps]
- Read each question. Depending on the kind, you'll see: ✓ Looks right / Edit (something to confirm), a row of option chips (a yes/no or multiple-choice call), a dropdown (a finish or attribute), or Pick… / Edit (opens the surface editor directly).
- Answer what you can. Anything you skip just doesn't get answered — there's no separate skip button to hunt for.
- Hit the primary Draft button when you're ready.
- In a hurry? The ghost "skip — draft with what we have" link underneath drafts immediately with your current answers.
[!tip] Every answer you confirm steers the scope toward the right work — the card only shows up when BidCraft genuinely can't tell from your inputs, so each one is worth a few seconds. If nothing's unclear, you'll see a simple ✓ Nothing to confirm instead of any questions at all.
Why scope comes first
Pricing every line, sourcing materials, calculating crew days, and applying your multipliers takes 15–45 seconds and burns real AI credits. If the underlying scope is wrong — wrong rooms, missed work, duplicated lines — you'd just throw that pricing away. So BidCraft splits the job in two:
- Phase 1 — Scope. A fast pass at the list of work, with no numbers attached.
- Phase 2 — Build. Full pricing, materials, and payment schedule, once you're happy with the scope.
You can iterate on Phase 1 as many times as you want without spending time waiting on a full rebuild. When the scope feels right, you lock it and let BidCraft price it.
The scope-draft prompt sees more than just dimensions — it also reads the AI's room-level condition scores and existing-material flags from your analysis. That's why a low-condition substrate ("mortar-bedded, condition 2") tends to surface as a demo/abatement line on the very first draft, even before the proposal is priced. Correcting one of those readings on the AI findings page and re-drafting changes the scope, not just the proposal.
Jobs with more than one room
When you capture two or more rooms (a Master Bath and a Hall Bath, say), the draft is written room by room. Every room you captured gets its own lines, named for the room, and the draft shows each room under its own heading.
Each room is built from your template for the job type, on its own. The Hall Bath gets your template's lines that fit the Hall Bath, worked out from the Hall Bath's own measurements, notes and photos. A room with no shower doesn't get your shower lines, and a niche or a bench only lands in the room your notes or measurements put it in. Demo comes in once per room, because each room's tear-out is its own work. Permits, haul-off and the final clean-up come in once for the whole job, under Whole job after the rooms: a line priced by the day adds up the rooms' days, and a flat price or fee (a permit, a dumpster) is charged once. A line priced by the square foot in one room uses that room's measurements only. If that room isn't measured yet, the line isn't priced by the square foot until it is: meanwhile it uses its crew days × your day rate, never your square-foot rate as the whole line. It never borrows another room's square footage. If you typed the measurements in yourself with no photos or notes, each room is built the same way, from your template or, without one, from BidCraft's standard list for the job type.
With photos or notes but no template for the job type, Biddy writes each room's lines from them instead, and work that covers the whole job, like demo and haul-off for both bathrooms, sits after the rooms.
Your other jobs stay out of it. Without a template for the job type, Biddy looks at how your last signed job of that type was split into lines (how many, in what order, on which of your services), then writes every line from this job's own notes, photos and measurements. It never copies that job's rooms, sizes, features or client names. Your templates, your catalog wording and your saved rules are used as you wrote them.
If your template has sizes, each room gets its own size from its own measurements, shown under the room's heading, for example Size Small bathroom · 35 sq ft · change. Two small bathrooms are two Small rooms, not one Large job, and each room's lines take that room's size prices.
To change a room's size, tap change under that room's heading and pick a size. Only that room changes: its lines for the new size come in, lines the new size leaves out go (unless you typed a price, a rate or days on them, or reworded them), and its lines take the new size's prices. The other rooms stay exactly as they are. Shared work under Whole job, like a dumpster priced by size, is charged at the biggest room's size. A room's new lines only include work that fits it, so moving a bathroom with no shower to Large doesn't add shower work. The size you pick stays when you re-draft.
A room that wasn't measured when the draft was written gets the middle size, marked assumed until measured. Once you measure that room, the next save moves it to the size its own measurements call for. Only that room's measurements count, never another room's. A size you picked yourself never moves.
If your template has packages, each room's lines that change between them come in on the package that room's own notes and measurements point to (marble in the Master Bath's notes never moves the Hall Bath's tile), or your recommended package. The Offer Good / Better / Best switch at the top (or Offer packages… in the Totals card, when the job type doesn't offer packages on every new bid) is one switch for the whole job: turn it on and your client picks a package once, and every room follows. Each room's line still shows in its room, with its room in the name ("Hall Bath — Floor tile"), and each room's package prices follow that room's size. Shared work under Whole job that changes between packages is priced at the biggest room's size. If your client wants one room different, like the Best tile in the Master Bath and Better everywhere else, Customize on their page changes that one room's line.
Your notes can rule work out. If your notes say the whole job has no demo ("NO DEMO", "no demo on this job"), or that you don't do certain work ("we don't install fixtures", "we only do tile and stone", "plumbing by others"), the draft leaves those lines off, and the scope tells you what it left out and why. A note about one part only, like "no floor demo" or "no plumbing changes", doesn't rule out the whole trade. A line you typed or edited yourself is never taken off. If your notes are unclear, the line stays and asks: when one note says "no demo" and another says "demo the tub surround", or a note says "maybe no demo" or "no demo, TBD", the demo line is drafted with "Notes unclear: include demo?" under it. Tap Keep to keep it or Remove to take it off; editing the line yourself answers it too. You are asked once per job: a re-draft remembers your answer, and haul-away goes with the demo answer. On a tub job (a tub surround, tub deck, no shower), the lines and questions talk about the tub surround, not a shower pan, curb or bench.
Added notes or photos after drafting? The scope says "You added notes or photos after this scope was drafted. Re-draft so it reads them." with a Re-draft the scope button. If you've edited lines by hand, BidCraft asks before replacing them.
If a room somehow ends up with no lines, BidCraft adds one for it, called "Room name — scope of work". That line holds what you said about the room in your notes, with no days or price yet. A note at the top of the scope tells you which rooms were added, so check that line and price it before you build.
When you build the proposal, BidCraft checks once more. If a room you captured has no line on the proposal (say you removed its lines), you'll see a warning naming the room. If you're not bidding that room, ignore it.
The room headings carry through to the proposal. To show your client one price per room instead of a price on every line, see Prices your client sees in Bid settings → Your proposal → Layout & sections.
How the work is grouped
New drafts are written the way most contractors write their own bids. Prep, waterproofing, grout, caulking and sealing, and edge trim are inside the tile line they belong to, not lines of their own. The line's description says what's in it, for example "Includes cement board prep and a waterproof membrane." Demo and haul-off are one line. Clean-up goes in the last line's description. A permit line is left off unless it's priced in your catalog or the job needs it: you answered yes to the permits question, or your notes mention a permit. A punch list or final walkthrough line is never treated as a permit; it's folded in with the clean-up, and a bare "final inspection" stays as its own line.
Nothing is lost when work is grouped:
- The days come with it. The prep and waterproofing days are added to the tile line, so a line priced by the day costs the same as the separate lines would have.
- So do the materials. The tile line carries the backer board and the membrane, and generating materials for it includes them.
- The schedule keeps its steps. Membrane, backer board, setting and grout tasks under the tile line still land in their own phases, so waterproofing still comes before tile.
A row that took in other work shows a short note under its description, like Includes prep, waterproofing and grout. If the line is priced by your per-square-foot rate, the note says in your tile rate, so you can see that your rate now covers that work. If it should cost more, type your own price.
Mitered edges and wrapped niches work differently, because they have prices of their own. On a bundled bid, a priced and measured Mitered edges or Wrapped niche line goes into its room's tile line, and its price is added on top. The note says so, like Includes 24 ft mitered edges. One with no price or no measurement stays its own line, showing Set a price or Measure mitered edges, so it can't slip through at nothing. A tile line set piece by piece also shows a reminder under it: piece-by-piece work is hard to estimate, so consider billing it as time & materials.
Billing a job as time and materials. When a job is too hard to price as one number, tap Bill time & materials, not to exceed… in the Totals card under your scope. Set the cap in days or in dollars. Biddy suggests the estimate plus one day, and the cap can't be lower than the estimate. Nothing on the scope changes price: its total becomes the estimate, and time is billed at your crew day rate plus materials. The proposal picks it up the next time you build it. On a tile line set piece by piece, the reminder is a link that opens this option. Once the client signs, change the terms with a change order instead.
Some lines stay on their own even in a grouped bid:
- A line you typed a price, a rate or a day count on.
- A line matched to one of your services that has its own price, like a $650 waterproofing service. Its price would get lost inside the tile line, so it stays a line.
- A tile line priced by your per-square-foot rate doesn't take in other lines' days, because those days wouldn't change its price.
- Prep or waterproofing next to a tile line that has no day estimate yet. BidCraft prices that tile line from its square footage when it builds the proposal, so the prep and waterproofing keep their own lines and still get billed.
- Work your own template lists as its own line. Your template, your call.
If you keep deleting a line, BidCraft stops adding it. Say you take the waterproofing line off your bids before you send them. After a couple of bids, BidCraft notices and puts the waterproofing inside your tile line for you, even when that tile line is priced by your per-square-foot rate or the waterproofing has its own price in your catalog. The row says you usually bid it this way so you know why. It looks at your last five sent bids: removed on at least two of them, and never sent as its own line. Send it as its own line once and it goes back to its own line on your next draft. A line you typed a price on always stays put. Work you listed under Work you never give its own line in Layout & sections is grouped the same way, and its row says from your proposal settings.
The same goes for any other kind of line. A toilet pull-and-reset line, a grab bar, an accent band: if you take the same kind of line off two of your last five sent bids, and none of them went out with it, your next drafts leave it off. Its work isn't lost. It's named in the line it belongs to, like "Includes the grab bar.", and it shows in the Not priced on this bid list at the top of your scope with Add back. Three things always stay: a line from your own template, an option for your client, and a line whose work this job's notes ask for ("reset the toilet"). Add it back and send it, and the next draft has it again. Leaving a line off never adds days or dollars to another line. If that work costs something on this job, add it back or raise the line it went into.
Prefer every step on its own line? In Bid settings → Your proposal → Layout & sections, set Line breakdown to One line per kind of work or One line per component. New drafts then list demo, prep, waterproofing, tile, grout and trim separately, like before. One line per room groups them. If you never picked a Line breakdown, drafts are grouped. Big whole-house jobs built from a plan set are always itemized room by room.
Fix the fixtures BidCraft found
Before you lock the scope, you can also edit any of the fixtures — sinks, toilets, showers, faucets, or anything else — that BidCraft pulled from your photos. This is useful when the AI missed a fixture or called it by the wrong name.
On the project page, open Capture, scroll to the room you want to edit, and look below its surface tiles — fixtures show up there as a row of chips. Tap any chip (or the + Add fixture chip at the end) and a small editor opens — a sheet on your phone, a centered window on desktop — where you can set the fixture's type and whether it's staying, being replaced, or removed.
Every change saves immediately and feeds straight into your next proposal draft. No Re-analyze needed.
One heads-up: If you click ↻ Re-analyze after editing fixtures, your edits get replaced with a fresh AI extraction. Re-analyze re-runs the analysis from scratch. So edit fixtures last, after you're done re-analyzing photos or tweaking dimensions.
What you're looking at
At the top of the page, under the three stage cards, a bar stays with you while you scroll: the draft total, how many lines are priced (with a progress bar and the rough margin), how many lines have materials, N need you in amber when something still affects the price, and Lock & build.
Each line is one row you can read at a glance:
- The line's name in bold and the first two lines of its description. A line that took in other work adds a short note under it, like Includes prep and waterproofing (see How the work is grouped).
- Three small icons beside it, always in the same spot:
- The service it matched — a link icon, filled when matched and amber when BidCraft isn't sure of the match.
- Its materials — a box icon with a count, or a dashed empty box when it has none yet. Materials are optional; the dashed box is just hard to miss.
- A flag with a count, in amber, when something on the line changes the price and needs your call (no price yet, a doubtful match, two lines covering the same surface, a product size to confirm). Colors and finishes aren't counted — the price is already right, so those can wait until after the client signs.
- The price on the right in bold, with its math underneath ($40 × 186 sqft), and the crew days beside it. A line with no price yet shows Set a price in amber.
The line you have open is tinted, with a dark edge down its left side, so you can see where you are in the list.
When the job has more than one room, the lines are grouped by room, each room on its own card with its name as a heading and its own subtotal (an optional line your client hasn't taken isn't in it). Work that isn't about one room — demo for the whole house, a dumpster — sits under Whole job at the end. + Add a line to Primary Bath at the bottom of a room's card adds a line straight into that room. A line joins a room when what it covers is in that room, or when its name says the room. The grouping is only how this page reads: your proposal keeps its own line order.
The line panel
Tap a line and its panel opens: beside the list on a computer, so the list stays readable and you can click the next line directly, and sliding up from the bottom on a phone or a narrow window. Tap one of the icons instead and the panel opens right at that part. Everything about the line is in the panel, stacked:
- The name and the full description, both editable.
- Needs you — what's left to settle on this line, each with a one-tap answer (Use it for a suggested service match, Fix for an overlap, Open for a material to check).
- Price — the price, the crew days, and whether the line is Required, Optional or a Choice.
- Service — Looks like Floor tile install, what the line covers and what's folded in, with Change to pick a different service or narrow what it covers. The warning when two lines cover the same surface shows here too.
- Materials — the count and the total, then the line's materials list.
Use ‹ › at the top to go to the previous or next line without closing, ▲ ▼ at the bottom to move the line within its room, Remove line to take it off, and Done to close.
In the panel's Service section you may see a match badge. This tells you whether BidCraft recognized the work from your services catalog:
| Badge | What it means |
|---|---|
| Green — Exact | This line lines up cleanly with one of your existing services. Pricing will anchor to that service. |
| Amber — Likely | A service in your catalog is probably the right match, but BidCraft isn't sure. Worth a glance. |
| Amber — Partial | Some overlap with an existing service, but the scope differs. Open it and confirm. |
| No badge | Brand new work BidCraft didn't recognize from your catalog. |
[!tip] Green badges are gold. The more lines match cleanly, the more your proposal anchors to your historical pricing for that exact work. If a match is wrong, open the line and pick a different service in its Service section — or "+ New service candidate" if none of your existing services fit.
The crew days you see are the final days
The day count on each line is already adjusted for the finishes on that line's surfaces. On a job with several rooms, a line for one room is adjusted for that room's finishes only. It isn't a straight-lay baseline waiting to get stretched later — what you're looking at is what the proposal will use.
On any line where the finishes moved the number, the math shows under the crew days in the line's panel:
2.0 base days × 1.5 = 3.0 days
That's your Difficulty multiplier tables doing the work — a herringbone marble wall takes longer than the same wall in plain 12x24, and the schedule should say so. Lines with nothing unusual on them just show a plain day count with no calculation underneath.
Type your own number and it's final. If you know that line is four days, type four. BidCraft ships it exactly as you typed it — it never multiplies your number a second time, and the calculation line disappears because there's nothing left to explain. Your day counts also survive a re-scope, so you don't have to retype them every pass.
Say the days in your notes and they're used too. Write or dictate "mud 5 days, tile 5 days" and the draft puts 5 days on your mud line and 5 on your tile line, marked from your notes. Those days are final just like typed ones: no difficulty multiplier, not divided by your crew, and never trimmed because a long job looks high. They only go on lines you price by the day. A line priced by the square foot, a flat price or a sub's quote keeps its own price. Days you type in the scope always win over your notes. Each re-draft reads your notes again, so if you delete or change the sentence, the old number goes with it. If you give the whole job's days ("this shower is going to take 12 days"), they go on your one by-the-day line only when everything else on the bid is priced by the day too. If the scope has more than one line priced by the day, or other work priced by the square foot or at a flat price, nothing is split. The scope says "You said 12 days. Which line?" so you type them on the right line. The same goes for days for work no line covers: "the niche will take 3 days" with no niche line shows "You said the niche will take 3 days. Which line?" Only you see that; your client never does.
If you've built out a template for this job type — and your project synthesis has enough detail to work with — BidCraft uses the template as the starting shape instead of generating scope from scratch. Each line then carries a small origin badge so you can see how it got there:
| Badge | What it means |
|---|---|
| Template | Carried over from your template line unchanged. Most lines should land here. |
| Template · adapted | Came from your template, but BidCraft adjusted the scope or quantity for this project's specifics. The reason for the change shows next to the badge. |
| Added from synthesis | Not in your template — BidCraft added it because your photos or notes called for work the template didn't cover. |
| ⚠ AI inferred | BidCraft added the line without a direct template or synthesis basis. Rare; review it carefully and remove if it doesn't fit. |
If BidCraft removed any of your template lines — say, "Demo existing shower" on a new-construction project — you'll see an "AI removed N template lines — review reasons" disclosure above the list. Expand it to see what was dropped and why. To restore a dropped line, hit + Add line at the bottom and pick it from your catalog.
Shaping the list
You have full control over the list before you lock it in:
[!steps]
- Edit a name or description — open the line and type in its panel. It saves as you go.
- Reorder lines — ▲ ▼ at the bottom of the line's panel move it past the line above or below it in the same room. That's the order it takes on the client-facing proposal.
- Remove a line — Remove line at the bottom of the line's panel, on a computer or a phone. It asks first, since the line's price, crew days and materials go with it. A line you remove stays off when you re-draft that job. Add it back by hand any time.
- Add a new line — "+ Add line" at the bottom. Useful when you spot work the AI missed. The new line's panel opens so you can name and price it.
- Save to catalog — every unmatched line has a "Save to catalog" checkbox in its Service section. Tick it if this is work you sell regularly. After the proposal generates, that line becomes a new service in your catalog so the next project matches it green.
[!note] "Save to catalog" defaults to checked on unmatched lines and unchecked on matched lines (no point duplicating a service that already exists). For one-off oddities — a specific allowance, a custom pass-through fee — uncheck it before locking.
Pulling lines from your services catalog: when you click + Add line, a search panel opens showing your existing services. Type a keyword to filter, see the service name and scope blurb, pick — the new line drops in with auto-filled details. See Adding a line from your services catalog for the full walk-through.
Removed every line? You'll see + Add line next to Draft, so you can build the list by hand. Pressing Draft on an empty list starts over, and lines you removed earlier can come back.
When the AI returns an empty scope
Once in a while the AI's first scope pass comes back empty — usually because of a transient hiccup with the model, not because there's nothing to do. BidCraft now retries automatically when this happens, so most of the time you won't even notice. If the retry also fails, you'll see a clear error message instead of a blank screen, and you can hit the Generate scope button again to try once more. A dropped connection isn't treated as a failure: BidCraft checks the saved job first and shows the draft if it landed. If your measurements are also looking off, they'll refresh on the retry.
Deciding what's your client's call
Every line has a three-way control — Required, Optional · included, or Optional · not included — and a + Add alternative… button that pairs it with other options your client picks between. Doing it here, before pricing runs, means each alternative gets priced on its own instead of stacking up as extra work.
Anything you've marked shows a tag above its title saying exactly what it is, and when the draft has options at all there's a line above the list summing it up: "This draft offers 1 optional add-on and 1 choice group. Your client picks on the proposal — the total they see updates as they choose." So you can tell at a glance what you're handing your client to decide, without reading every line.
The draft only marks a line optional when your notes ask for an option ("optional", "upgrade", "alternate", "add-on", "maybe", "if they want it" and the like) or your template marks that line Optional. Anything else comes out Required.
One thing worth knowing: the descriptions won't hedge. An optional line is written the same way a required one is — plain description of the work, no "if they want it" or "confirm with the homeowner". That's deliberate. The tag says whether it's optional; the description says what the work is.
Full walkthrough: Offering options and add-ons.
The prices are already here
Every line that matched a service in your catalog comes back priced. The row shows the amount, what it's based on underneath it ($40/sqft × 186 sqft, or flat · full bath, or $650 each · shower niche, or $45/sqft × 94 sqft · your rule), and the crew days under that. A service with a flat price or a per-item price always charges that price — your crew-day estimate still sets the schedule, but it doesn't change what the client pays for that line. It's your service's pricing, your measurements, and your difficulty multipliers — worked out on the spot, not guessed.
Open the line and type over any of those numbers in its Price section. On a line priced by the square foot (or linear foot) the Price section is laid out as the math: [rate] × [quantity] with the total beside them, the two numbers in boxes you tap to change and one line underneath saying where they came from ("$40 base × 1.395 for the finishes · 62 sqft from the measurements"). Tap the total to type the whole line's price. Change the rate, and the quantity stays measured. Change the quantity, and the rate stays your service's. Type the whole total and that price wins outright; the rate and quantity step back until you reset it. A line priced per item — a shower niche, a bench — uses the same layout with a count instead of a measurement: [$650] × [1 each]. Change the count to 2 and the line is $1,300; the build bills it the same way. A line matched to a service you price by the hour shows your hourly rate beside an hours box: type the hours and the line is rate × hours. Until you do, it's priced the way it always was (your usual price for that service, or crew days × your day rate) — BidCraft never guesses hours. A service priced by the day charges its day price × the line's crew days. Lines with a flat price just have a Total. Anything you type says "your rate", "your quantity" or "your price" with a Reset beside it, and applies to this bid only: your service keeps its own rate. The crew days sit underneath. Whatever you type, the build honors exactly. Your number always beats ours.
Service minimums. When a service has a minimum charge and the line's estimate comes in under it, the line bills the minimum. The row says so under the line's name, for example Half-day minimum (est. 2 hrs). The crew days still show the real estimate, and that's what the schedule uses. To waive it on this bid only, open the line and tick Skip minimum on this bid in its Price section. A price or days you type always win. If they're under the minimum, the row just says Below your half-day minimum, and nothing is changed for you. On the proposal, the line bills the minimum, and when your proposals show line descriptions it ends with "(half-day minimum)". On the Costs view, the line shows the estimated and billed days side by side.
Price changes when… When one of a service's conditions matches the job, it sets the line's price and the row names it under the line's name, for example Small tear-out: $3/sq ft (under 40 sq ft) or When removing tile on a mud bed: +40%. The size is what's coming out of the room: the floors and tiled walls marked with what's there now, or all of them when none are marked. To charge the normal price on this bid only, open the line and tick Use normal price on this bid in its Price section. A price you type always wins. When a condition needs a fact the job doesn't have yet, the row asks it in one tap, for example Is this tile on a mud bed? Changes the demo price — Yes / No. Your answer is saved on the room's surfaces and the line re-prices. When it needs the size, the row asks you to measure what's coming out.
Job types with sizes. When your template for this job type has Small, Medium and Large prices, the scope shows the job's size at the top, for example Medium shower · 82 sq ft · change. BidCraft picked it from the measurements. Lines that change by size read Medium price under the amount. Tap change to pick another size: those lines re-price and size-only lines come and go, but a line you've edited stays. With no measurement yet, BidCraft uses the middle size and says so, for example Medium shower · assumed until measured · change. Once the measurement is in, the next re-draft or change to the scope moves it to the measured size, unless you picked the size yourself. A price you type still wins. See Quoting by size.
Job types with packages. When your template for this job type has packages (Good / Better / Best), each line that changes between them comes in as one line, on the package your notes and measurements point to (or your recommended one), and its price reads Job type price under the amount. To let the homeowner choose, turn on Offer Good / Better / Best beside the size: each of those lines becomes a choice, one row per package. If the job type doesn't offer packages on every new bid, there's no switch until you want one: tap Offer packages… in the Totals card, and the switch shows on this bid from then on. While packages are on, each line's price reads like Best price, and the line also says which package it's on and why, like Best · from your notes: large format. Turning it off keeps the package you have selected. Your typed prices and wording stay put either way. Shared lines like demo are ordinary lines. A price you type still wins. See Offering packages.
Lines BidCraft can't price yet — usually something with no matching service and no rule to fall back on — say ≈ prices at build in italics, with a "set a price now" link if you'd rather settle it here. Those are the only lines the AI prices when you lock.
Materials ride along with every line. Tap a line's materials check (or open the line and scroll to Materials) and you get what the work needs, quantities already scaled to this job's square footage, with costs from your catalog. On a line matched to one of your services, the list starts from what that service says it needs. The first four materials show; Show N more opens the rest.
Each material is one short row: what it's for in bold, the product under it, then the quantity and the cost. If something about it is still open, a small tag after the product says so. A dashed color later means the product is a stand-in of the right family, so the price is already right and the actual color can wait until after the client signs. An amber tag like Confirm size can change the price, so it's worth a look before you lock. Under the last row: Show N more, + Add and ✦ Suggest more.
Tap a material and it opens right where the row was, one at a time:
- Swap product at the top picks a different product for that role (it reads Pick a product when nothing is picked yet). On a line matched to one of your services the pick saves to that service, for every job; on a line with its own materials list it saves on this bid only, and the picker says which.
- Quantity. The number, with any waste already in it, and the rule behind it in words ("1 bag per 50 sq ft of wall"). Tap the number, or Change how it's figured, to open that rule; it lives on your service, so every job that uses it follows. A row with a product picked reads its rule from that product's coverage; tap Change on the product to fix the coverage in a popup, or Use my own rule instead for this one service. If the product has no coverage on file yet, the row uses the usual trade rate and says assumed.
- Cost. A cost you know beats the catalog's. You don't choose where it saves; the sentence under the box says where it lives ("This cost belongs to the product…", "…lives on the service…", "…lives on this bid only"). Where do these numbers live? at the top of the list explains the ladder: product, then service, then this bid.
- Color (or finish, or size), when it's still open: Choose later leaves it, Keep this one settles it with the product shown, and Pick another… opens the product picker.
- At the bottom: Remove from this job (the service keeps it, and ↩ Put back on this job on the row undoes it), Cancel, and Save.
A line with no materials says so in a dashed box. Materials are optional. + Add a material and Suggest materials are right there. On a line that matched no service, what you add or suggest lives on this bid; match a service later and it comes along, or lock with Save to catalog ticked and the brand-new service is born carrying it. Swap an item and the price updates then and there, before a proposal exists.
The bar at the top stays with you while you work through the scope. Tap N need you for a checklist of each line and what it needs; every item jumps straight into that line's panel at the right spot. Color and finish picks aren't in the count, since they can wait until after the client signs. When nothing needs you, the chip turns green: Ready to lock ✓.
Below the list, the Totals card is honest about what it knows: roughly where the unpriced lines will land, your materials so far, the margin on what's priced, and who supplies the tile.
Materials and tile on their own lines. When you bill materials or tile separately, or give a tile allowance (the Materials and Tile tiles in Bid settings), the Totals card shows the Materials, Tile or Tile allowance line the proposal will carry, already in the total. Under Who supplies the tile? you can pick Follow my setting or any of the four tile answers for this job. Lock & build saves how you charge materials and tile with the bid, so a later change to your settings never moves it; Re-scope and lock again to put it on your new settings. A tile answer you change on the job itself still counts after lock: rebuild the proposal to reprice.
Lock & build
When the scope reads right to you, hit Lock & build in the bar at the top. If anything still needs you, BidCraft lists it first: Review them opens the checklist, Lock anyway goes ahead with things as they are (you can re-scope later). Locking formats the client's proposal, prices only the lines you left unpriced, finalizes the materials list and cost analysis, and drafts the task list — stages ② and ③ of Bid light up, and tasks appear on Schedule. Everything you priced or overrode carries through exactly as you set it. Right before it locks, BidCraft re-checks every line against the prices on your screen, so even if a catalog price changed since your last edit, the proposal bills exactly what the table showed you.
Once the scope is locked, it's read-only: the bar at the top says 🔒 Scope locked with a Re-scope button where Lock & build was, and a line's panel says so at the top and shows its numbers as plain text rather than boxes. Re-scope unlocks it (owners and admins).
A locked scope also keeps its prices: each line shows the price it was locked with (or, if it never had one on the scope, the price its proposal line was built at — as built in your proposal). Changing a service in your catalog later doesn't move a bid you've already built, and regenerating the proposal keeps those prices too. Want an older bid on your current prices? Re-scope it — the table shows today's prices, and Lock & build bills exactly those.
When a price is different from your scope
A priced line ships at the price you read. Two things can still move a number between locking and the finished proposal, and when either one does, the line wears a small amber chip in Costs & materials saying so — tap the line to read the full sentence:
- "priced at build" — this line had no price on the scope table (no matching service, no rule to fall back on), so BidCraft priced it when it built the proposal. These are the lines the italic ≈ prices at build was pointing at.
- "scope $408 → $576" — the line was re-measured between locking and building. Your rate didn't change; the square footage under it did. That happens when you confirm a plan reading or type a wall area after locking.
Above the document there's a one-line summary of the same thing — how many lines moved and by how much — so you never have to work it out by subtraction. If nothing moved, neither the chips nor the summary appear.
Once a proposal exists, the Scope & pricing chip at the top shows the proposal's total and says so, rather than quoting a scope figure that can drift out of step with the document you're about to send.
If the proposal comes back and you want to change the scope — not just edit prices, but actually rework the list of work — there's a Re-scope button in the Proposal section that unlocks Phase 1 again so you can iterate further.
Locked but no proposal? Unlock from the project page
Once in a while a proposal build fails mid-flight (network blip, timeout, AI error) — scope ends up locked but the proposal never landed. BidCraft checks the saved job first, and if the build really didn't land you get one plain sentence and Try again. The project page also surfaces an Unlock scope & edit button so you can drop straight back into Scope Review with your draft intact. No menu-diving, no starting over — just hit the button and keep iterating.
Next steps
Locked your scope? Head to Generating your first proposal to see what Phase 2 produces. If you want to understand inline editing once the proposal is built, read Editing line items.
Email andy@businessupai.com and a real person on the BidCraft Tile team will get back to you. If you're signed in, you can also ask Biddy from any page in the app.