Pricing by the day

Some contractors price every job by the day. Others price tile by the square foot and add-ons by the piece, and only use a day rate for the odd job. BidCraft handles both, and lets you switch one job without touching the rest.

How do you price jobs?

In Settings → Bid settings → Pricing, open the Day rate tile. Under How do you price jobs?, pick one:

  • My service rates — your catalog prices do the work. Square-foot tile is priced by its measured area, a niche at its set price, and anything without its own price uses your day rate.
  • By the day — every labor line is days × your crew's day rate. That includes tile work you also have a square-foot price for.

Whichever you pick is the starting point for every new job. Each job can switch on its own (see below).

What "By the day" does to each kind of line

  • Tile you also price by the square foot — priced from its measured square feet, never from a guess at the days:
    • if the service has its own production rate (how many square feet your crew does in a day), the days are the measured area ÷ that rate;
    • otherwise the days are the measured area ÷ your pace (below) ÷ the setters on the crew;
    • a line that sets tile AND does prep — say "Mud bed & mosaic tile floor" — still uses the pace for the surface it's on;
    • only when the line doesn't set tile at all (demo, prep, waterproofing, grout and seal priced by the foot) or nothing is measured yet does it use its own day estimate — and then it's marked Days estimated — check so you look at it before you send.
  • Add-ons with their own price (a niche at $650, a bench, a flat demo price) — keep their set price. A job can turn on Price add-ons by the day too if you want those priced by their days as well.
  • Permits, fees and other pass-through items — stay at cost.
  • A price you typed on a line — always wins.

Your pace

Your pace is how many square feet one setter sets in a day, for wall tile, floor tile, backsplash and shower floors. It's in the Day rate panel in Bid settings, under "How do you price jobs?", and the signup questions ask for it when you pick By the day.

It starts filled in with conservative numbers — wall tile 50, floor tile 75, backsplash 30 and shower floor 15 square feet a day. Those are the slow end of what tile setters commonly quote for one person laying standard tile straight. They aren't measured from your jobs, so put in your own.

96 sq ft of shower walls, a pace of 50 and two setters: 96 ÷ 50 ÷ 2 = 0.96 days, × a $1,500 crew rate = $1,440.

Pattern, large-format tile and stone still slow the job down through your multipliers, on top of the pace.

Your crew size changes the days

Biddy estimates each line's days for one tile setter working alone — setter-days. The job's days are those setter-days divided by the number of setters on the job's crew, and the price is the job's days × the crew's day rate.

Four setter-days of tile, with a crew of two setters ($600 a day each) and a helper ($300): 4 ÷ 2 = 2 days × $1,500 = $3,000. A solo setter on the same work: 4 days × $600 = $2,400.

Before this, a bigger crew raised the day rate but the days never shrank, so the line came out about twice what it should. Helpers and apprentices don't divide the days — they make the setters faster, which is already in your crew's day rate.

Each line on the scope shows its days for your crew, with the setter-days underneath ("from 4 setter-days"), and the price reads like "2 days × $1,500 crew rate".

A few things are never divided by the crew:

  • days you type on a line yourself — those are your days for this job;
  • days you state in your notes ("tile 5 days") — the draft puts them on that line as your days;
  • days that come from your own catalog or template defaults ("how long my crew takes");
  • lines on bids drafted before this change — they price exactly as they did.

On a flat day rate, your crew counts as one setter, so the days are Biddy's setter-days as written.

Keep new days for future bids

When you change the days on a line priced by the day, a Use for future bids switch shows under the days. Switch it on and the service, and the template line it came from, start with your new days on the next bid. It never changes a price. It starts on when the days were BidCraft's guess, and off when they were already yours. Undo puts the old days back.

Round up to whole days

Turn on Round up to whole days (in the Day rate panel for every job, or on a single job) and BidCraft adds up the job's day-priced labor, rounds the total up to the next full day, and adds the difference as one clearly labelled line — for example "Round up to whole days (+0.5 days)". It is never hidden inside your other lines, so you and your client both see it.

A line billed at a service's minimum counts its billed days here. A half-day minimum on a 2-hour demo counts as half a day. Rounding up comes after each line's minimum, and your project minimum still comes last.

Switching one job

On a job's Bid page, the Totals card has Price this job by: My usual rates / By the day, with the add-ons and round-up switches underneath. The same switch is on the job's Crew view, next to the crew that sets its days.

  • Before it switches, BidCraft shows you both totals — "Service rates: $X · By the day: $Y" — and warns you clearly when they're more than 20% apart, so you can check the days and your pace first.
  • While a job is priced by the day, the same two totals stay under the switch.
  • The scope re-prices as soon as you switch.
  • If the job already has a proposal, BidCraft tells you before it switches: the proposal keeps its prices until you rebuild it, and the next rebuild uses the new ones.
  • Bids you already built never change on their own. Changing your default in Bid settings doesn't move a scope you've already locked.

The conversion, both ways

Under the switch, each job shows the other way of looking at its price — for your information only, it never changes a number:

  • a job on your service rates shows ≈ X days for your crew;
  • a job priced by the day shows ≈ $Y per sq ft of tile laid by the day — worked out only over the tile that was actually priced from its square feet, so a demo day or a prep day never drags the number down. Jobs on your service rates never show it.

Ask Biddy

Biddy knows how each job is priced, your pace and who's on the crew. Ask "why is the shower walls line $1,440?" and you'll get the square feet, the pace, the setters and the crew rate behind it.