Your bids now charge for materials and tile the way you do
Some shops roll thinset and grout into their square-foot price. Others put materials on their own line. Now you tell BidCraft which one you are, and every line on every bid follows it.
Open Settings → Pricing templates and tap Materials. Pick one:
- Included in my prices. Nothing gets added on top of any line, crew-day lines included. What the materials cost you still counts, so your margin stays honest.
- Billed at cost. The materials go on their own Materials line on the proposal.
- Billed with a markup. The same line, plus your markup.
When you bill them, choose one Materials line per job or one per room. The panel shows a sample job before and after, so you see the change before you save.
Then tap Tile and pick who supplies it: Client buys it, a Tile allowance (a set price per sq ft; 120 sq ft at $4 puts a $480 allowance line on the bid, and upgrades are billed at the difference), I supply it, included, or I supply it, billed separately on its own Tile line. Any one job can still pick differently under Who supplies the tile?
A few things you'll notice:
- Nothing is charged twice. Crew-day lines stop adding materials once they're included or on their own line.
- Options and add-ons keep their own materials, so a declined add-on never lands on the Materials line.
- The difficulty multiplier stretches the labor, not the thinset. A $16 price with $4 of materials on a ×1.5 mosaic comes to $22, not $24.
- One service can do its own thing: in the line editor, Materials on this line says Follow my setting, Included in this price, or Billed separately.
- A bid you've already locked keeps the answer it was locked with.
Until you pick, your bids price exactly the way they always have.