Mud beds, panels and mitered edges price the way you price them

A Setting bed tab for mud-bed work, oversized panels and piece-by-piece tile on your difficulty tables, and mitered edges and wrapped niches on their own lines.

Mud beds, panels and mitered edges price the way you price them

On our last member call, contractors walked through the jobs that take longer than the square footage says. Tile on a 40-year-old mud bed. A 4×8 panel that takes four people on suction cups. A mosaic set one piece at a time. Mitered corners that are "like dental work." Tell BidCraft once, and every bid prices them the same way.

What's new

  • A Setting bed tab. Under Difficulty multiplier on Pricing templates there's a fourth tab next to Size, Material and Pattern. If you've never priced setting beds, it says Price mud-bed work higher? Add a mud bed row. One tap adds Foam pan or board (thinset) at 1.00x and Mud bed (mortar) at 1.40x, and you can change the numbers before you save. It adds onto the other three tables, the same as they add onto each other.
  • Setting bed on each surface. The surface editor has a Setting bed pick (foam pan or board, or mud bed). Say "mud bed," "mortar bed" or "floated" in a note and Biddy fills it in for you to check.
  • Thin porcelain panels. 48x96, 48x110, 60x120 and any other size bigger than 24x48 are tile sizes now, and they land on your largest-size row.
  • Piece by piece. A pattern for loose pieces set one at a time, separate from sheet mosaic. The scope reminds you that this work is hard to estimate, so consider billing it as time & materials.
  • Mitered edges and wrapped niches get their own lines. Set a wall's Edges to Mitered, or a niche to Wrapped / mitered edges, and the draft adds a Mitered edges line (per linear foot, from the exposed edge plus outside corners times wall height) or a Wrapped niche line (each). Nothing is guessed. An unmeasured mitered wall says Measure mitered edges.

What doesn't change

Your existing tables stay exactly as they are. Nothing prices a mud bed until you add the rows, and every bid you've already sent stays as sent. On a bundled bid, a priced edge line goes into its room's tile line with a note like Includes 24 ft mitered edges, and its price is added on top. On an itemized bid it stays its own line.

The full walkthrough is in Day rate, multipliers, and overhead.