Jump to…
Editing scope text and payment schedule
The line items table is the dollars-and-cents part of a proposal, but the language around it carries just as much weight. The scope-of-work paragraph sets the tone and tells the client what they're buying. The payment schedule tells them when they're paying. The terms & conditions cover your back. All three are editable on every proposal, and all three auto-save.
The scope of work
BidCraft generates a full scope-of-work paragraph based on your project synthesis and your chosen proposal style. It's written in client-facing language — not contractor jargon, not bullet points, but real sentences that explain what work is being done and why.
Click anywhere in the scope text to start editing. Format it the way you would an email. What you see while you type is what your client sees:
[!steps]
- Select the words you want to change, like a section header such as "#2 Basement Bathroom Shower".
- Tap a button in the bar above the scope: B for bold, Heading for a section title, • List for bullets, or 1. List for numbered steps.
- Tap the same button again to undo that formatting, or use the undo and redo arrows on the right.
Each line you type stays on its own line on the proposal, the PDF and the client's link. That makes it easy to list wall measurements one under the other.
[!tip] The Ctrl+B (or ⌘+B) shortcut also bolds selected text on a computer.
If you'd rather rewrite the whole thing than tweak it, you can clear the field and start fresh. Or ask Biddy to rewrite it: "make the scope more conversational" or "shorten the scope to 3 sentences."
Notes
Your Notes section starts with the default text from Layout & sections. Tap Edit next to Notes to change it for this proposal only, or + Add notes if there are none. Clear the text and the section disappears. Rebuilding the proposal keeps your notes.
The payment schedule
Every proposal comes with a payment schedule — the one saved for the proposal style it was written in, or your company schedule if the style doesn't have its own. If you've never set one, it's usually two payments: a deposit when the client signs and the balance on completion.
To change the schedule new proposals start with, go to Settings → Bid settings → Getting paid and tap the Payment schedule tile. Pick a quick start — 50 / 50, Thirds (34 / 33 / 33), All on completion, or Custom — then rename, add or remove payments as you like. Each client type at the top can have its own. Tap Save when it looks right.
If you keep more than one proposal style, the editor also asks Which schedule this style uses: the Company schedule (the one every style without its own falls back to — editing it changes it for all of them) or Its own schedule. Handy when builders pay on milestones and homeowners pay half up front.
You can edit any payment right on the proposal page. Hit Edit on the proposal bar and scroll to Payment Schedule:
[!steps]
- Click a payment's name to rename it (e.g. "50% deposit" → "Deposit due at signing").
- Type the percent you want, like 10 or 12.5. Or tap − and + to move it 1% at a time.
- Or type the dollar amount instead, like 1,000. The percent is worked out for you, so the payment comes to exactly that amount, to the cent.
- Press Enter or tap away to keep the change. Press Esc to put it back.
- Add or remove payments with + Add milestone and the trash can — useful for jobs that have unusual cash-flow needs.
[!note] A dollar amount you type is saved as a share of the total. If the total changes later (you add a line or a discount), that payment changes with it, like any other percent.
The payments have to add up to 100%. If they don't, a note under the schedule shows what they add up to and what they need to be, in percent and dollars. Tap Put the difference on the last payment to make it add up in one go. You can keep editing in the meantime — BidCraft won't let you send the proposal, or copy its link, until the payments add up to 100%. The send panel says so, and Fix payments takes you straight to the schedule.
[!note] If you've connected BidCraft to take native payments, each milestone becomes a separate invoice the client can pay through their proposal link. The deposit fires automatically when the client signs; the rest stay on hold until you trigger them from the project's Payments section.
Billing a job as time and materials? The proposal shows only the deposit from your schedule, with a line saying the rest is billed for actual time and materials as the work goes. The totals read Estimated and Not to exceed, and the line items are labeled as an estimate. Your agreement says the same: if it doesn't mention the cap itself, the T&M terms are added right after the total price. To word it your own way, use {{pricingBasis}} (the full sentence) and {{notToExceed}} (the cap) in your terms.
Adding a discount
Want to knock something off the total — a military discount, a repeat-customer thank-you, a "sign this week" sweetener? Open the ··· menu on the proposal bar and pick Add discount (owners and admins, before the client signs).
You get two ways in:
-
Your saved discounts — one tap applies any discount you've set up in Settings → Bid settings → Your proposal → Discounts & upgrades. Save the ones you offer often (military, senior, referral) so you never have to type them twice.
-
Custom discount — name it, pick percent or dollars, enter the value. Good for one-off deals.
A few things worth knowing:
- One discount per proposal. No stacking. Once one is applied, a small chip with its name and amount (e.g. Military Discount −$1,240) sits in the Notes row under the proposal bar. Tap it for Change or Remove; the ··· menu also reads Change discount.
- The client sees it as its own line. The proposal shows Subtotal, then the discount by name (e.g. Military Discount −$1,240), then the Total Estimate. Clients love seeing what they saved — that's the point.
- Everything downstream follows the discounted total. Payment milestones, deposits, and invoices all recalculate from the new total automatically. Your Cost Analysis shows the margin after the discount too, so you know exactly what the goodwill costs you.
- Locked at signature. Once the client signs, the discount is part of the deal — you can't change or remove it (the chip still shows it, marked locked). Price changes after signing go through a change order, same as any other money change.
Editing after a signature — the warn-don't-block banner
If you edit the scope, line items, or payment schedule on a proposal that's already been signed, an amber banner appears above the proposal, with your client's name in it: "Dana can't see this change. She signed the earlier version. Send a change order to make it official."
The reason: the version they signed is locked to that snapshot. Edits you make on your end after their signature stay invisible to them — the legal doc they're holding is the snapshot at signature time, not whatever you're editing right now.
The banner doesn't block you from editing — sometimes you legitimately want to make internal-only adjustments. But when the change actually matters to the homeowner (price went up, scope expanded, milestone moved), click Create change order right from the banner (it reads Edit draft change order if you already started one). Your pending edits convert into a draft change order automatically, no retyping. The homeowner signs just the change. Full walkthrough at Sending a change order.
Terms & conditions
The terms and conditions block sits at the bottom of every proposal in its own full-width section so it gets the visual weight it deserves. You set a default version during onboarding — "work proceeds after deposit cleared," "changes require written approval," "warranty covers workmanship for one year," etc. — and every new proposal uses that default.
If a specific job needs different terms, you can override them just on that proposal without touching your default. Hit Edit on the proposal bar, scroll to the Terms & Conditions section, and tap the Edit button in its header. Your changes stick to this proposal only — the default stays untouched for the next job. An amber "Edited for this proposal" tag appears next to the heading so you can tell at a glance, and Reset to template puts it back.
Edited terms show everywhere this proposal does: on your own proposal page, in the PDF you download or print, and on your client's copy. If you clear the terms out completely, the proposal goes back to your default terms.
The price, deposit, payment schedule and date inside your terms are highlighted while you edit. Those figures fill in from the proposal, so they stay right when you change a line or the total moves. Edit the words around them as much as you like. To change a figure, change the proposal itself.
If a figure in edited terms no longer matches the proposal (for example, you rewrote the sentence around the total), a yellow note above the terms tells you which figure is off and what it should read. Fix it there, or use Reset to template. The note shows only to you; it never appears on the PDF or on your client's copy.
[!warning] Per-proposal terms overrides don't affect your default terms. If you find yourself making the same override on every proposal, update your default in Settings → Bid settings → Your proposal → Terms so you stop having to do it manually.
The date on the proposal
The date at the top of the proposal is the day you send it. A draft shows today's date, so a PDF you download today is dated today. Once it's sent, it shows the day it went out.
To use a different date, hit Edit on the proposal bar and click the date under the proposal number. Pick a day, then Done. Use the send date goes back to automatic. The date you pick shows on the header, the PDF and anywhere your terms mention the proposal date. You can also ask Biddy: "date this proposal October 1."
A link you've already sent keeps the date it went out with. The new date goes to your client the next time you send or resend it.
Attachments & photos
Below the terms you'll find Attachments & photos — the badges, insurance certificates, documents, and past-work photos going out with this proposal. Your defaults are already ticked; uncheck anything you don't want on this particular job, or swap the portfolio photos for ones that look more like this client's space. Full details in Badges, credentials, and portfolio photos on proposals.
Everything auto-saves
There's no Save button on the scope editor, the payment schedule, the terms block, or the attachments picker. Every keystroke is debounced and sent to BidCraft two seconds after you pause typing. Clicking Done Editing saves anything still waiting before it closes, so you never have to count to two. If a save does not go through, the editor stays open with your change in it and tells you; click Done Editing again to retry. If it still cannot save (for example a change that is locked once the proposal is signed, or no connection), click Leave without saving beside the red message to close the editor and keep the last saved copy.
Next steps
For the line items themselves, head to Editing line items. If your hand-edits feel like they're fighting the AI's first draft, Regenerating the proposal explains how to ask BidCraft for a second pass that respects what you've already changed.
Email andy@businessupai.com and a real person on the BidCraft Tile team will get back to you. If you're signed in, you can also ask Biddy from any page in the app.