Sending a change order

Jobs change. The homeowner adds a niche, you find rotted subfloor under the demo, the original tile is back-ordered and they want to upgrade. You used to be stuck either eating the change or going back to email a separate quote that nobody signed. Not anymore — change orders are a first-class part of BidCraft now.

When to use a change order

A change order is the right move whenever the price or scope of a signed proposal needs to change. Use one whenever:

  • You discover work that wasn't in the original (rotted subfloor, old plumbing that needs replacing, asbestos backing)
  • The homeowner asks for a scope addition (added niche, accent band, heated floor, upgraded tile)
  • A line item needs to come out (they decided against the bench, the curbless shower turned out to be impractical)
  • Pricing on an existing line needs to shift up or down for a documented reason

The original signed proposal stays in your record exactly as it was. The change order is a separate, additionally-signed document that amends it.

Three ways to start one

From the proposal page (Bid → ② Proposal): once the proposal is signed, the violet button on the proposal bar reads Change order. Press it. (If you already have a change order you haven't sent, it reads Continue change order and opens that draft instead of starting another. If one is sent and waiting on your client, it reads Edit change order #2 and opens that one. See Editing a sent change order.) You'll see your existing proposal lines on the left for reference, and a builder on the right where you make your changes.

From an edit you already made. If you edit a signed proposal, an amber banner appears above it: your client can't see this change because they signed the earlier version. Tap Create change order (or Edit draft change order if one exists) and your edits carry into the change order.

Or ask Biddy, on any project chat: "add a $1,800 subfloor repair line — found rotted subfloor", "bump the demo line by $400 for asbestos disposal", "remove the niche, homeowner cancelled it." Biddy walks you through the same builder, asks how you want it billed, and creates the draft. If your client already agreed, say so: Biddy makes the draft and tells you where to record it with no signature. Biddy can't do the recording for you. If a draft already exists, Biddy points you to it instead of creating another — asking again for the same lines won't add them twice, and asking for something new adds just that line to the draft.

Building the change

You can do four things in the builder:

[!steps]

  1. Add a new line — title, description, quantity, unit price. Standard line-item editor.
  2. Modify an existing line — change price, quantity, description, or notes. The original line stays in the original proposal; the change order overlays your new value.
  3. Remove a line — mark a line for deletion. The original signed proposal still shows it, but the change order cancels it from the active scope.
  4. Edit the scope-of-work text if the language needs adjusting too.

You'll see a running summary at the top: "Original total: $24,500 · Change: +$2,400 · New total: $26,900."

If the change comes to $0.00, or a new line has no price, Review says so before you send, and names the line (for example "“Sealer” has no price."). A swap at the same price is fine, so send it as it is. Your client's copy then says the change doesn't change their total.

Picking the payment mode

Before you send, you pick how the change gets billed. There are three options:

ModeWhat it doesWhen to use
Roll into remaining milestones (default)Spreads the change across whatever milestones are still pending, proportionallyMost cases — the work fits the existing schedule
Due on signatureCreates one new invoice for the change amount, fires when they signDiscovery work, asbestos hazards, things you need paid for ASAP before continuing
New custom scheduleThe change order gets its own milestone breakdownLarge amendments that are essentially mini-jobs in their own right

On a time and materials job the choices read a little differently, because there are no milestones, only bills. The builder shows how far the not-to-exceed moves, then:

ModeWhat it does
Spread across the next bills (default)Adds an even share of the change to each of the next few bills. You pick how many (two to start). The final bill clears anything left.
Due on signatureOne invoice for the change, when they sign.
Billed as timeNo separate charge. The cap goes up, and the work is billed as time on your bills.

There's no custom schedule on these jobs. Whichever you pick, the signed change order raises the not-to-exceed and the estimate by its amount, and your client's change order says so.

With Roll into remaining milestones, each milestone's sales tax moves with its new amount, at the rate that milestone already had, so the tax is never left at the old figure. Paid, voided and processing milestones don't change.

Gave a discount on the proposal? It stays with the original job. Your extras and credits are the amounts you enter, so a change order on a $41,019.10 job that adds $2,530 shows a new total of $43,549.10, on your screen and on your client's copy.

Already collected some of it? If you added a separate invoice for money the client paid toward this work (a deposit, say), that amount doesn't get billed again. Only the rest goes on the remaining milestones, and the builder shows you how much before you send. Example: a $4,500 job with a $2,500 deposit invoice and an $8,800 change order adds $6,300 to the last milestone, so everything billed adds up to the new $13,300 total.

If you've got Stripe payments connected, the invoices fire automatically when the homeowner signs the change order. Without Stripe, the same invoices show up in your Payments section as Awaiting send the moment they sign. Send them from there when you're ready, and log payments by hand as they come in. A change order that reduces the price never creates an invoice: with Roll into remaining milestones the credit comes off your unpaid milestones, and if nothing is left unpaid you refund the difference yourself. If you're routing through BusinessUp CRM, the change order link goes through your existing BusinessUp CRM workflow plus a new tag (covered below).

Recording a change your client already approved

Sometimes the client has already said yes, or already paid you, for the extra work, and asking them to sign something now would just be a hassle. You can record the change order instead. Nothing goes to the client: no email and no link. BidCraft still adds the work to the job, so your contract total, job costing, invoiced and collected numbers all match.

[!steps]

  1. Build the change order as usual.
  2. Above Payment terms, tick Client already approved — record it, no signature.
  3. Pick how it gets paid:
    • Add to next invoice puts the whole change on your next unpaid milestone. The builder shows which one and its new amount. If every milestone is already paid, the change becomes its own invoice in your Payments section, ready for you to send when you want. (If your invoices go through BusinessUp CRM, it goes on the job's BusinessUp CRM invoice instead. See Recording on BusinessUp CRM.)
    • Already paid logs the payment. Enter the amount (it starts at the change order's amount), how they paid (check, cash, Zelle, ACH, wire or other), the date, and a reference like a check number if you want one. Nothing is charged and no receipt goes out.
  4. Tap Continue to Review, check it over, then tap Record change order.

A few things to know:

  • Only changes that add money can be recorded. If the change lowers the price, the box is greyed out. Send that one for signature.
  • Paid less than the full change? Enter what they actually paid. The rest stays on the change order's invoice as a balance due, and you record it in the Payments section when it comes in. If you enter more than the change, BidCraft records the change order's amount.
  • Is the money already recorded on another invoice? Don't use Already paid for it, because that logs the same money twice. See When the client already paid the extra on an invoice.
  • Already paid needs an owner or admin. Other team members can still record a change with Add to next invoice.
  • If your invoices go through BusinessUp CRM, BidCraft checks the job's BusinessUp CRM invoice when you open Review and tells you what it will do there before you tap Record change order. See Recording on BusinessUp CRM below.
  • If the billing doesn't finish (say the connection drops partway), the change order still counts as recorded. Its row in the History panel shows what went wrong with a Finish recording button. Tap it to finish. It picks up where it stopped, so nothing gets billed twice.

When you already sent it and the client won't be signing

You sent the change order, your client said yes, and they're never going to sign it. You don't have to revoke it and start over.

[!steps]

  1. On the proposal page (Bid → ② Proposal), tap Open history ›.
  2. On that change order's row, tap Record as approved.
  3. Pick how it gets paid: Add to next invoice or Already paid. If your client already paid this money as extra on an invoice, BidCraft finds it and starts with that, so nothing counts twice.
  4. Tap Record as approved.

Nothing goes to your client. If they open the link you sent, it shows as approved, and they can't sign it. This works after they've opened it and after its date has passed. If a newer change order came after an expired one, BidCraft asks you to start a new one instead, because the numbers have moved on. Only changes that add money can be recorded this way.

When the client already paid the extra on an invoice

Say your client agreed to $600 of extra work and paid a $2,850 check against a $2,250 invoice. Record the check on that invoice. BidCraft asks "Client paid $600 extra. Add it as a change order?" Tap Add change order. If you've moved on, the invoice's row in Money → Payments has the same offer: Add it as a change order.

The builder opens with the $600 as a line and the record box ticked. If you already started a change order on this job and haven't sent it, it opens that one instead. Then Continue to Review and Record change order. If you already sent one, Record as approved opens for it instead.

BidCraft raises the invoice to $2,850 to hold the change. Your one check stays one payment, and your contract, invoiced and collected numbers all agree. In the History panel it reads Recorded and Already paid.

The change can't be more than the extra your client paid. Lower it, or untick the box to bill it another way. This works on invoices in BidCraft, not on BusinessUp CRM invoices.

Recording on BusinessUp CRM

If your invoices go through BusinessUp CRM, the job already has a BusinessUp CRM invoice. When you tap Continue to Review, BidCraft reads that invoice and tells you which of these it will do:

  • Add a line to your BusinessUp CRM invoice. For example: Will add "Change Order #2: Niche" to BusinessUp CRM invoice #1043. BidCraft adds one line for the change, with no tax, and leaves every other line on the invoice exactly as it is, including lines you typed in by hand.
  • Link it and add nothing. For example: Already on BusinessUp CRM invoice #1043 — nothing will be added. You see this when you already typed the change into the invoice yourself, so its total already includes it, or the invoice already has a line for this change order.
  • Ask you. If the invoice total doesn't match the job, either before this change or with it (say you changed something else on the invoice), BidCraft shows you both numbers and you pick: add the line anyway, it's already on the invoice so add nothing, or make a separate BusinessUp CRM invoice. Nothing is added until you pick.
  • Make a separate invoice. If the job's BusinessUp CRM invoice is paid, void, or has a payment going through, or the job doesn't have one, BidCraft makes a small BusinessUp CRM invoice just for the change. BidCraft doesn't send it. Send it from BusinessUp CRM when you're ready.

With Already paid, BidCraft also records the payment on the BusinessUp CRM invoice, unless BusinessUp CRM already shows that money as paid. The payment is logged in BidCraft either way, so the two match.

Recording on BusinessUp CRM sends nothing to your client and doesn't add the Action: change order signed tag, so none of your "signed" workflows fire.

If your BusinessUp CRM invoice has a percentage discount, BidCraft changes it to the same dollars when it adds the line, so the discount stays on the original job and the invoice goes up by the full change. If the invoice doesn't go up by the full change, BidCraft tells you right after you record so you can check it.

If BusinessUp CRM doesn't answer partway through, use Finish recording. It reads the invoice again first, so it never adds the line or the payment twice.

In the History panel a recorded change order reads Recorded instead of Signed, with who recorded it, the date, and Already paid or Added to next invoice. It counts toward your signed total like a signed one. There's no Copy link on it, because there's nothing for your client to sign.

What the homeowner sees

They get an email with the change-order link. By default the email says how much the change adds or takes off and the new total. You can change what it says, or leave the amounts out, under Settings → Bid settings → Sending → Emails to your client (pick Change order). The page opens with:

  • A clear "You previously signed this proposal on [date] for $X" header
  • A before/after of what's changing — added lines highlighted, modified lines showing old → new, removed lines shown with a strikethrough
  • The new project total
  • A signature block at the bottom for the change order specifically
  • A View original proposal link at the bottom, so they can pull up the deal they already signed and compare

They sign just the change order. The original signature isn't touched. The original signed proposal stays exactly as it was in your records.

Change orders also show in your client's customer portal, on the Money tab: each one by number with what it adds or takes off. One waiting for them has a Review and sign button; a signed one has View. A change order you haven't sent yet never shows there, and the Overview's money card notes when a signed change order is already in their total.

How it shows up on the proposal page

Each change order you send gets its own dot on the History line under the proposal bar, after the proposal's dot. While one is out, the bar says so: Change order #2 waiting on Dana. Tap Open history › and the History panel lists:

  • The original proposal at the top with its own status
  • Each change order below it as its own row with its amount and status
  • Each row has its own Copy link, View as client, Edit (while it isn't signed), Resend (while it's out with your client) and Revoke actions, plus Record as approved on one that's out and adds money

The total on the bar reads Signed total once the proposal is signed, with every signed change order rolled in. So if your original was $24,500 and you've got two signed COs adding $2,400 and $700, it reads $27,600. The top of the History panel shows the same breakdown, plus how much more it comes to if your client signs one that's still waiting.

[!tip] View as client opens the change order in a new tab from your perspective — it doesn't count as a homeowner view. So you can sanity-check what they're seeing without polluting the view count.

What about BusinessUp CRM users?

If you've got proposal-via-BusinessUp CRM turned on, change orders work too. The change-order link gets pushed to the same proposal custom field on the contact, plus a new tag fires: Action: send change order. Unless you've told BidCraft you have a BusinessUp CRM workflow on that tag, BidCraft emails the change order to your client itself, and adds a note on the BusinessUp CRM contact so you can see it was sent. If you'd rather BusinessUp CRM send it with your own copy, build a workflow on Action: send change order and tick I have a BusinessUp CRM workflow on this tag under Connected apps → BusinessUp CRM → Workflow Triggers.

Invoicing through BusinessUp CRM when the homeowner signs

When a homeowner signs a change order, BidCraft automatically creates a BusinessUp CRM invoice for the change amount — the difference, not the full project total. This follows the same Auto-create invoice on sign setting you've already configured — the same one that governs original-proposal invoicing:

  • Send — the invoice is created in BusinessUp CRM and sent to the homeowner the moment they sign.
  • Draft — the invoice is created in BusinessUp CRM as a draft the moment they sign, but not emailed automatically. You review and send it from BusinessUp CRM when you're ready.
  • Off — no invoice is created automatically, but you'll see a Create invoice in BusinessUp CRM button on the signed change order's row in the History panel so you can trigger it when you're ready (or retry if the first attempt didn't go through).

Either way, once the change order is signed, the change amount appears in the project's Payments view in BidCraft so your money picture stays complete.

A couple of things worth knowing:

  • Roll into remaining milestones adds the change to the job's existing invoice. When your client signs, BidCraft adds one "Change Order" line to the job's BusinessUp CRM invoice. If that invoice has a payment schedule, payments already made stay as they are and the unpaid ones go up to cover the change. Your milestones in Payments go up to match. No second invoice is created, and BidCraft doesn't send your client anything new. If it can't update that invoice (it's paid or void, auto-pay is on, its schedule doesn't match what's been paid, its total doesn't match the job, or BidCraft can't find it), a separate draft invoice waits for you in your CRM and BidCraft tells you. Nothing goes to your client until you send it.
  • Change orders that reduce the total don't create an invoice. If the net change is a credit — any change order that reduces the project price — BidCraft skips the BusinessUp CRM invoice entirely. With Roll into remaining milestones, the credit comes off your unpaid milestones instead: the amounts in your Payments section and the payment schedule on the proposal go down to match the new total, and a milestone the homeowner has already paid down to its new amount shows as paid. If nothing is left unpaid, you handle the credit however makes sense: an adjustment in BusinessUp CRM, a cash refund, a note in the file.

See Sending proposals via BusinessUp CRM for the full BusinessUp CRM integration walkthrough.

The CO builder, like the proposal Send menu, has two delivery options:

  • Send — BidCraft actually emails the homeowner (or fires your BusinessUp CRM workflow) with the change-order link. The change order's row in History shows "Emailed to …".
  • Generate Link — BidCraft creates the link and copies it for you, but doesn't email anyone. Use this when you want to text the link or hand it over in person. The change order's row in History shows "Link made for you to send".

After you use Generate Link from the CO builder, the project page shows an amber banner reminding you that BidCraft didn't send anything yet. The banner tells you whether the copy actually landed on your clipboard, and either way it prints the full link so you can press and hold to grab it by hand. Same pattern as the proposal Send flow.

Expiration dates on change orders

A change order gets your default expiration date (Bid settings → Sending → Expiration & reminders) when you send it, not when you start the draft. Its row in the History panel has the same Extend and Change date buttons as the proposal. An expired change order can't be signed, doesn't stop you starting a new one, and can be revoked to clear it away. See Proposal expiration dates.

Editing a sent change order

A sent change order stays editable until your client signs it. That includes after they've opened it, and after its date has passed. You don't have to revoke it and type everything into a new one.

[!steps]

  1. On the proposal page (Bid → ② Proposal), tap Edit change order #2 on the proposal bar. Or tap Open history › and Edit on that change order's row.
  2. The builder opens with the change order as you sent it. Make your changes.
  3. Tap Continue to Review, then Send Update to Homeowner. Your client gets an email with the updated change order. (Generate Shareable Link updates it without an email, so you can text the link yourself.)

What your client sees:

  • Their link shows your changes as soon as they're saved. Your changes are saved when you tap Send Update to Homeowner, Generate Shareable Link or Record change order. If your invoices go through BusinessUp CRM, they're also saved when you open Review with the record box ticked. It's the same link, so an old email or text still works. If you close the builder before any of that, nothing changes for them.
  • Send it again so they hear about it. The email says it's an update that replaces the version sent earlier, and lists what changed (for example "Second shower niche: $250.00 → $300.00"). If the change saves but the email doesn't go out, BidCraft tells you so. Try sending it again.
  • Their page says what changed. Until they sign, a box at the top of their change order reads "Updated [date]: what changed since the version you were sent", with the same list. Changes you make before you send it again add up to one list, compared with the version they last got.
  • They can't sign a version they didn't see. If they had the old version open and try to sign, BidCraft doesn't record the signature. A large notice at the top says "This change order was updated", lists what changed, and tells them to review it and sign again at the bottom. The signature box starts empty again, and the same reminder sits right above it.

On your side, an edited change order shows as not opened again until your client opens the new version, so Viewed always means they saw the latest one.

Once a change order is signed it can't change. Make a new change order for anything after that. If your page still showed Edit when your client had just signed, tapping it tells you it's already signed and refreshes the page. The page also checks again by itself while a proposal or change order is waiting on your client.

Sending a change order again

Sent a change order to the wrong address, or your client can't find the email? Send it again as it is, with no edits.

[!steps]

  1. If the address was wrong, fix the client's email on the job first.
  2. On the proposal page (Bid → ② Proposal), open the ··· menu and tap Resend change order #2. Or tap Open history › and Resend on that change order's row.
  3. BidCraft asks "Send Change Order #2 again to dana@example.com?" and lists anyone who gets a copy. Check the address, then tap Send again.

Nothing in the change order changes, and it doesn't count as an update. If it was already opened, it still shows as opened. If its sign-by date has passed, it gets a new one, and the question says so. If the job has no email, BidCraft makes the link again for you to copy and send yourself. Resend shows for a change order that's sent, opened or past its date. It doesn't show for a signed, recorded or revoked one.

You can also Copy link, Record as approved or Revoke a sent change order from its row in the History panel. See Resending, revoking, and new shareable links for the full breakdown.

[!warning] Revoking a change order doesn't undo the original signed proposal. If you want to scrap the entire amendment idea, just revoke the CO link — the original deal stands.