Your scope follows your notes
The first draft of your scope now listens to what you wrote about the job.
- Work you rule out stays out. Write "no demo", "we don't install fixtures", "we only do tile and stone" or "plumbing by others" in your notes, and the draft leaves those lines off. The scope shows what it left out and why, so you can add anything back.
- Tub jobs read like tub jobs. A tub surround job gets tub wording, with no shower pan, curb or bench lines or questions.
- Every measured surface gets a line. A tub deck, wainscot, trim or a heated floor you measured or mentioned no longer goes missing.
- New notes, fresh draft. Add notes or photos after drafting and the scope says so, with a Re-draft the scope button.
Lines you typed or edited yourself are never taken off. More in Reviewing the scope of work.