BidCraft Tile
BidCraftTile
Jump to…

Rebuild a past proposal in BidCraft

The fastest way to learn BidCraft is to build a job you already know. Pick a proposal you've sent a client before, show it to BidCraft, and rebuild it here. You get three things out of it:

  • BidCraft learns you. Your services, your prices and the way you write all come off that proposal.
  • You learn BidCraft. Biddy walks you through building that same job, one step at a time, so your first bid isn't a guess.
  • You see how the prices line up. BidCraft prices the job from your own settings and puts its number next to yours. Where it's off, one tap fixes your rate for every bid after it.

Owners and admins can do this. Start it from Rebuild a past proposal wherever you see it while you get set up.

1. Snap it

Lay the proposal flat in good light. Tap Take a photo of page 1, then Add page 2, and so on until you have every page. Each page shows up as a numbered thumbnail. Use the arrows to fix the order, or the βœ• to retake one. Up to 12 pages make one proposal.

Have the PDF? Tap Choose photos or a PDF and pick it instead. A PDF is read on its own, so you don't need photos too.

When the pages look right, tap Read this proposal.

2. We read it

Biddy reads every page together as one proposal, so a table that runs onto page 2 is still one table and the total on the last page is the total. It usually takes under a minute. You can leave the page open and it updates by itself.

If it can't read the pages, you'll see why. Clear, flat, well-lit photos work best, and the PDF works even better.

3. Check it

You'll see what BidCraft found:

  • The client. Name, company (for a builder or business) and the job address, filled in from the proposal. Fix anything that's off.
  • The job type. BidCraft suggests one, like Shower remodel. Change it if it's wrong, or leave it on Let BidCraft decide.
  • The work. Every line from your proposal, with the square footage and your price.

Leave Learn my services, prices and writing style from this proposal ticked to add those lines to your catalog with your prices and teach BidCraft how you write. Untick it if you only want the project.

Tap Rebuild it in BidCraft. Learning takes about a minute, then the project opens.

4. Build it with Biddy

The project opens with Biddy's guided bid already started. It follows the same path every bid takes:

  1. Project Home. The next-step card always tells you what to do next.
  2. Capture. Each room from your proposal has a note listing the work that was in it. On a new job, this is where your photos, voice notes and measurements go. If Biddy needs anything to price the job right, like a size it couldn't find, the question shows up here. Each one takes a tap.
  3. Bid. Your lines, in your words, with the square footage carried over. Tap any line to fix the wording or the price.
  4. BidCraft vs. yours. See the comparison card below.
  5. Lock & build. Biddy prices every line, picks the materials and writes the proposal in your style.
  6. The proposal. What your client sees. To change the wording or a price, tap Edit at the top of the proposal.
  7. Send. Send it to yourself first if you like, so you see exactly what a client gets.
  8. The rest of the job. Biddy opens Money, Schedule, Feed and Client for you, one stop each, then you pick where to go next: the Community or your first real bid.

You can Pause the guide at any step. A small Continue button waits in the corner of that project until you're ready. End guide stops it for good.

Your original vs. BidCraft

On the Bid page of a rebuilt project, a card shows Your original next to BidCraft for the same job, line by line where the lines match. Before you lock the scope, BidCraft's number is the priced draft. After you build, it's the proposal.

Your old prices are only there for comparison. BidCraft never copies them into the bid. It prices the job from your own pricing settings, which is how you find out whether those settings match the way you really price.

Where a line is priced from one of your catalog services and the two numbers are more than a few percent apart, you'll see Raise my rate or Lower my rate for that service. Tap it, check the new rate, and confirm. Every bid that uses that service prices from the new number from then on. This bid picks up the change the next time you re-price or rebuild it.

Good to know

  • Do it with a proposal for a typical job, one you'd happily do again at that price.
  • A proposal priced one total per room compares room by room instead of line by line.
  • Rebuilding the same proposal twice opens the project you already made instead of creating a second one.
Was this article helpful?
Still need help?

Email andy@businessupai.com and a real person on the BidCraft Tile team will get back to you. If you're signed in, you can also ask Biddy from any page in the app.